Bathroom renovation

A bathroom rebuild touches plumbing, waterproofing, tiling, electricals and joinery. We do all of it under one roof, so you sign one contract and chase one project manager.

What a full Tidewell bathroom rebuild covers

Most renovations split between an interior designer, a tiler, a plumber and an electrician — with arguments about who broke what. We bring the entire scope inside one project lead.

  • Demolition with full plastic curtaining of corridors and lifts
  • Two-coat polyurethane waterproofing with 48-hour flood test
  • Floor and wall tiling with proper substrate prep
  • New copper or PPR cold and hot lines as required
  • Concealed cistern frames and skin-mounted carrier walls
  • Vanity, mirror cabinet, glass partition, towel rails
  • Final cleaning, silicone trims and homeowner walkthrough
Modern bathroom renovation with walk-in shower
Typical timelines

How long a Klang Valley bathroom takes

Fixture refresh (3–5 days)

New vanity, faucets, WC, shower set and accessories without disturbing existing tiles or waterproofing.

Tile-over refresh (6–8 days)

Overlay tiling on serviceable existing tiles plus full fixture replacement. Ideal for older flats.

Full strip-out (10–14 days)

Demolition to slab, fresh waterproofing, new piping, new tiles, new everything. The proper job.

Multi-bathroom (3–4 weeks)

Two or three bathrooms staggered so the household never loses access to a working WC and shower.